Infrastructure
Lifting Capacity , Bay Cranes : 250MT. (550,000.0 lbs)
Max Ht of Equipment : 6.5M (21.0 ft)
-
Forming
Rolling : 125mm (5 inches)
Presses : 400MT & 1200MT
Heads >12.0 in crown & petal construction.
-
Drilling
Tubesheet upto 400mm thk drilled using CNC Drilling
machines.
-
Testing
Destructive Testing Lab & RT Developing Dark Room.
LPT, UT, RT, PMI, Hardness testing available.
All types of Destructive Testing such as HIC, SSC, Hot
Tensile, H2 Disbonding tests can be done.
|
-
Welding
SMAW , GTAW, FCAW, SAW, EFSW
Automatic Small Dia Weld overlay
-
Heat Treatment
All types of Heat Treatment done
Annealing ,Stress Relieving ,Normalizing, Quenching &
Tempering, Solution annealing,
Stress Relieving of large jobs in Temporary furnace
Local Stress relieving by Electric Resistance method
Stress Relieving by Internal Firing Method.
-
Painting Booth
6.0M HT x 7.5M Ht x 13.5M Lg
-
Nearness to Ports
Mumbai Port : 60KM
JNPT Nava Sheva : 30 KM
|